The Woodsmith Project - S73 Project Amendments : Planning Statement

Condition Number

Current Wording

Proposed Amendment

Terms – Permanent Above Ground Structures

the Lady Cross Plantation Proposed Site Plan (Drawing No 653-LC- AP-0203 Rev 2) but excluding spoil mounds and bunds

Means all above ground structures shown on the ‘Woodsmith Site Proposed Operational Compound Site Plan and Block Plan’ (Drawing No. 1500-ARI-PA-18-01005 Rev. D) or the Ladycross - Operational Masterplan (Drawing No. 2300-ARI-PA-18- 01000 Rev E) but excluding spoil mounds and bunds

Table 7.2 R/2014/0627/FFM – Proposed Amendments

Condition Number

Current Wording

Proposed Amendment

R/2014/0627/FFM 14

Prior to the commencement of development at Tocketts Lythe, Lockwood Beck or Wilton Portal, a Written Scheme of Archaeological Investigation (WSI) shall be submitted to the Local Planning Authority for approval in writing. The WSI shall be implemented in accordance with the approved details. No development at Tocketts Lythe, Lockwood Beck or Wilton Portal shall take place until a surface water drainage scheme for that site, based on sustainable drainage principles and an assessment of the hydrological and hydro geological context of the development, has been submitted to and approved in writing by the Local Planning Authority. The drainage strategy should demonstrate the surface water run-off rates from the impermeable areas of the site during and following construction are limited to greenfield rates. The scheme shall be implemented in accordance with the approved details and thereafter be maintained. Prior to commencement of development at Wilton Portal, Lockwood Beck and Tocketts Lythe a revised Hydro geological Risk

Amend condition to remove reference to Tocketts Lythe.

16

Amend condition to remove reference to Tocketts Lythe.

20

Amend condition to remove reference to Tocketts Lythe.

Pg 60