The Woodsmith Project - S73 Project Amendments : Planning Statement
Condition Number
Current Wording
Proposed Amendment
Guidance (March 2014) (Reference ID: 27-057-20140306 and 27-058- 20140306).
• and shall prescribe timescales within which restoration will occur. The restoration scheme shall be implemented as approved. Amend condition to reflect ongoing compliance with details previously approved under NYM/2019/0524/CVC (Woodsmith) and NYM/2021/0581/CVC (Ladycross).
95
Prior to the commencement of each Phase of Construction the Operator shall submit to the MPA for approval, Written Schemes of Archaeological Investigation (WSIs) covering the areas of Dove's Nest Farm and Lady Cross Plantation. The WSIs are required to be submitted and approved prior to site Preparatory Works and implemented in accordance with the agreed programme. The WSIs shall be implemented as approved by the MPA prior to the Commencement of Development and alongside construction operations. Prior to the Date of Production the Operator shall submit to the MPA for written approval a scheme of contingency screening and landscaping measures for the purposes of mitigating light emission resulting from surface transport of mine employees from the welfare building to the mine access shaft via the mine head internal access road. Such measures may include both hard and soft screening and landscaping measures, which shall thereafter be implemented in accordance with a timetable to be included in the scheme and subsequently maintained for the duration of the development. Prior to the commencement of permanent spoil disposal in the Bund C area, details of expected final contours and levels above ordnance datum of permanent spoil mounding in the Bund C area (as defined on drawing YP-P2-CX-032 Issue 10) shall be submitted to the MPA for written approval and final ground levels in the Bund
96
Delete condition to reflect proposed relocation of the welfare building.
98
To reflect the latest indicative bund details, it is requested that this condition is amended as follows:
Prior to the commencement of permanent spoil disposal in the Bund C area, details of expected final contours and levels above ordnance datum of
Pg 58