The Woodsmith Project - S73 Project Amendments : Planning Statement

Condition Number

Current Wording

Proposed Amendment

Removal of plant, equipment and above ground concrete structures;

3 months from the end of a continuous period of twelve months throughout which the winning and working of mineral has ceased; or two years before the expiry of this planning permission

• • • • • •

Treatment/capping of mine shafts;

Creation of final landform;

Soil replacement;

Cultivation, seeding and planting measures; and

Removal of roads

The restoration scheme may be modified only with the written approval of the MPA and shall include, but need not be restricted to; • The removal of buildings; • Removal of plant, equipment and above ground concrete structures; • Treatment/capping of mine shafts; • Creation of final landform; • Soil replacement; • Cultivation, seeding and planting measures; and • Removal of roads • Closure of unnecessary accesses to the

Closure of unnecessary accesses to the highway and removal of the ghost island right turn lane at Haxby plantation;

• An Aftercare Scheme outlining the steps to be taken in bringing the land to the required standard for use in agriculture including an outline strategy for a five year Aftercare period including annual review meetings with the MPA in accordance with Paragraphs 057 and 058 of Minerals Planning Practice Guidance (March 2014) (Reference ID: 27-057-20140306 and 27-058- 20140306). and shall prescribe timescales within which restoration will occur, The restoration scheme shall be implemented as approved

highway and removal of the ghost island right turn lane at Haxby plantation; An Aftercare Scheme outlining the steps to be taken to restore the land into a suitable other use or landform (to be agreed by NYMNPA) including an outline strategy for a five year Aftercare period including annual review meetings with the MPA in accordance with Paragraphs 057 and 058 of Minerals Planning Practice