Excavation of ramp;
•
• Temporary stockpiling of extractive materials from the ramp excavations;
• Construction of precast segment manufacturing facility;
• Construction of precast segment storage area and installation of portal cranes;
• Construction of the concrete batching plant and aggregate bins for precast segment manufacture;
• Construction of the sedimentation treatment plant for the concrete batching plant wastewater;
• Use of attenuation ponds for surface water drainage;
• Electrical installations from 11kV supply point; and
• Site installation for Tunnel Boring Machine (TBM) facilities and TBM set up.
SCL Drive
3
R/2018/0505/CD
05/11/2018
•
Electrical infrastructure comprising: and
•
Switchroom
•
Transformer
-
Neutral Earth Resistor box
-
• Commissioning of segment production facility;
4
R/2018/0572/CD
14/11/2018
• Commissioning of concrete batching plant;
• Production of concrete for segment manufacture;
Production of segments; and
•
• Stockpiling of segments in the storage area.
TBM Drive; and
5
R/2019/0042/CD
07/03/2019
•
• Transportation of extracted materials to off-site location.