Relocation of process water tank;
•
Covered materials handling area; and
•
Installation and use of ventilation heater.
•
• Sinking of the shafts from the top of the Rot salt to the base of the shafts and associated earthworks; • Installation and use of saline non-domestic waste water treatment plant and associated infrastructure;
18
NYM/2023/0530
04/10/2023
• Installation and operation of Fin Fan Coolers and associated infrastructure on the shaft platform;
Installation and use of workshops;
•
• Installation and operation of tubbing laydown and associated infrastructure;
• Installation and use of pump house at surface water attenuation pond;
• Installation and use of Electrical Ring Main Unit;
• Construction and operation of laydown facility to southern end of site;
• Installation and use of Below Surface Muck Transfer System at MTS shaft;
• Installation and operation of Fire Water Pumping System; and
Earthworks to landscape bunds.
•
• Installation and use of Minerals Transport System (MTS) mucking system & associated infrastructure
19
NYM/2025/0230
28/04/2025
• Installation and use of chemical seal grout plant
• Installation of fire water systems at Liquified Natural Gas (LNG) plant
• Revised Shaft Boring Roadheader (SBR) methodology on the Service Shaft and Production Shaft
Ladycross