Extension to materials handling area;
16
NYM/2022/0378
16/06/2022
•
• Installation of workshop, office and Control and Substances Hazardous to Health (COSHH) store at Grout Plant;
Revised warehouse building;
•
• Revised segregated materials store (handling bunker);
• Addition of loading bay to Non-domestic Wastewater Treatment Plant (NDWWTP);
Installation of CCTV lattice mast;
•
• Construction of northern section of Bund F;
• Revised layout to bus drop-off/pick-up area; and
Workshop extension.
•
• Installation of additional welfare provisions;
17
NYM/2022/0902
03/03/2023
Amendment to the security building;
•
• Creation of vehicular holding and borehole casings storage area on former reinjection pad;
Additional storage in logistics compound;
•
• Sinking of the Service and Production Shafts between base of Lias and top of Rot Salt;
• Insets to the Service Shaft, Production Shaft and MTS Shaft;
• Simultaneous operation of the concrete batch plants;
Revised lattice mast specification;
•
New façade to main welfare building;
•
Creation of Bund E attenuation ponds;
•
Relocation of workshops;
•
Pg 10/21 40864454v1