Report

Extension to materials handling area;

16

NYM/2022/0378

16/06/2022

• Installation of workshop, office and Control and Substances Hazardous to Health (COSHH) store at Grout Plant;

Revised warehouse building;

• Revised segregated materials store (handling bunker);

• Addition of loading bay to Non-domestic Wastewater Treatment Plant (NDWWTP);

Installation of CCTV lattice mast;

• Construction of northern section of Bund F;

• Revised layout to bus drop-off/pick-up area; and

Workshop extension.

• Installation of additional welfare provisions;

17

NYM/2022/0902

03/03/2023

Amendment to the security building;

• Creation of vehicular holding and borehole casings storage area on former reinjection pad;

Additional storage in logistics compound;

• Sinking of the Service and Production Shafts between base of Lias and top of Rot Salt;

• Insets to the Service Shaft, Production Shaft and MTS Shaft;

• Simultaneous operation of the concrete batch plants;

Revised lattice mast specification;

New façade to main welfare building;

Creation of Bund E attenuation ponds;

Relocation of workshops;

Pg 10/21 40864454v1

Powered by