Extension to warehouse facility;
•
Installation of siltbuster chemical store;
•
• Installation of weatherproof storage shelter in MTS maintenance area;
• Installation of bollard lighting between the welfare car park and the security cabin; and
Extension to welfare building canopy.
•
• Establishment of a shuttle bus pick up / drop off area adjacent to the existing main welfare facility.
13a
NYM/2021/0471/CVC
22/07/2021
• Establishment and use of temporary workshop and stores areas;
14
NYM/2021/0431/CVC
22/07/2021
• Establishment and use of tubbing storage and bunded washdown area;
Installation and use of fuel store;
•
• Installation and use of bunded COSHH (Control of Substances Hazardous to Health) storage area;
• Additional welfare facilities to the rear of the main welfare building;
• Installation and use of grout plant wash down area;
• Establishment of construction phases helipad, for emergency and training use only;
Establishment of protective battery wall;
•
Installation of harmonic filter; and
•
• Installation of earthworks testing container.
• Movement of temporary soil bunds and establishment of a drill pad for borehole remediation;
15
NYM/2021/1019/CVC
04/02/2022
• Installation of cover over Service Shaft and Production Shaft muck bunkers;
• Establishment of Control of Substances Hazardous to Health (COSHH) containers at COSHH pad and Non-Domestic Waste Water Treatment Plant (NDWWTP); and
• Hydrogeological investigation boreholes at Production Shaft and Service Shaft.