Report

Extension to warehouse facility;

Installation of siltbuster chemical store;

• Installation of weatherproof storage shelter in MTS maintenance area;

• Installation of bollard lighting between the welfare car park and the security cabin; and

Extension to welfare building canopy.

• Establishment of a shuttle bus pick up / drop off area adjacent to the existing main welfare facility.

13a

NYM/2021/0471/CVC

22/07/2021

• Establishment and use of temporary workshop and stores areas;

14

NYM/2021/0431/CVC

22/07/2021

• Establishment and use of tubbing storage and bunded washdown area;

Installation and use of fuel store;

• Installation and use of bunded COSHH (Control of Substances Hazardous to Health) storage area;

• Additional welfare facilities to the rear of the main welfare building;

• Installation and use of grout plant wash down area;

• Establishment of construction phases helipad, for emergency and training use only;

Establishment of protective battery wall;

Installation of harmonic filter; and

• Installation of earthworks testing container.

• Movement of temporary soil bunds and establishment of a drill pad for borehole remediation;

15

NYM/2021/1019/CVC

04/02/2022

• Installation of cover over Service Shaft and Production Shaft muck bunkers;

• Establishment of Control of Substances Hazardous to Health (COSHH) containers at COSHH pad and Non-Domestic Waste Water Treatment Plant (NDWWTP); and

• Hydrogeological investigation boreholes at Production Shaft and Service Shaft.

Pg 9/21 40864454v1