The Woodsmith Project - S73 Project Amendments : Planning Statement

Condition Number

Current Wording

Proposed Amendment

shall be submitted to and approved in writing by the Local Planning Authority. This Remedial Action Plan should include: • A procedure for investigating and escalating a trigger value breach, and for informing the appropriate regulator (the Environment Agency) • A list of individuals (and their contact details) who are responsible for identifying and investigating a trigger value breach;

A list of individuals and organisations to be informed in the event of a breach or a confirmed departure from the established baseline; Actions to protect the environment in the event of a suspected or confirmed environmental incident or departure from the established baseline (these may be specific to certain construction / operational activities or receptors, but should include the possibility of stopping relevant works while the breach is investigated).

31

(LOCKWOOD BECK AND TOCKETTS LYTHE): Following the approval of the Revised Hydro-Geological Risk Assessment but prior to the commencement of development a Groundwater Management Scheme (covering construction, operation and post- operation phases), shall be submitted to and approved in writing by the Local Planning Authority. The Scheme shall include technical drawings detailing the conceptualised hydrogeology with the final detailed designs of the proposed mitigation measures outlined in the Environmental Statement. Development shall thereafter proceed only in strict accordance with the approved Scheme and a timetable to be included within it. (TOCKETTS LYTHE): No development shall take place until a Surface Water Management Scheme based on sustainable drainage

Amend condition to remove reference to Tocketts Lythe.

33

Delete condition to reflect removal of Tocketts Lythe from the Project.

Pg 62