• Installation of additional construction phase attenuation pond;
• Extension to the existing segment facility storage building; and
• Extension to the second storey welfare building for the tunnelling contractor.
• Installation of a new parking area and additional welfare and storage containers to those previously approved under Phase 8.
8a
R/2022/0402/CD
22/06/2022
• Surface track infrastructure extension works
9
R/2023/0532/CD
13/09/2023
- Removal of existing tarmac haul road and hardstanding to facilitate construction of new surface track foundations;
- Construction of reinforced concrete pad with perimeter drainage;
- Installation of additional loco rail tracks; and
Extension of existing loco workshop.
• Installation and use of chemical buffer tank for onsite storage
• Construction and operation of containerized storage compound
- Concrete pedestrian surface between containers and walkways;
Surface water drainage;
-
- Provision of power to location for external lighting and containers; and
- Installation of security gates and fencing to pedestrian area.