• Reticulation of mains power from Northern Powergrid kiosk;
6
NYM/2018/0401/CVC
07/08/2018
• Construction of temporary secure storage unit;
• Civils work to construct an access road, pad and associated drainage in a previously cleared area within Haxby Plantation; and
Second level of welfare buildings.
•
• Installation and operation of a Liquified Natural Gas (LNG) plant.
6a
NYM/2018/0663/CVC
25/01/2019
• Completion of Service Shaft headgear chamber;
7
NYM/2018/0585/CVC
19/11/2018
• Completion of Service Shaft to 83.17m AoD via VSM method;
• Excavation of Production Shaft headgear chamber;
• Excavation from base of Production Shaft headgear chamber to 83.66m AoD;
• LNG generation plant mechanical and electrical fit out;
• Surface water run-off silt treatment facility building;
• Erection of temporary facilities to enable mobilisation of deep shaft sinking contractor;
Earthworks and drainage; and
•
Contingency grouting of the MTS Shaft.
•
• Construction of permanent Service Shaft building, including installation of winder equipment; and
8
NYM/2018/0771/CVC
05/04/2019
• Construction of permanent Production Shaft building, including installation of winder equipment.
• Installation and operation of temporary Secure Storage Unit (SSU);
9
NYM/2019/0041/CVC
29/03/2019
• Installation and operation of non-domestic wastewater treatment plant;
• Installation and commissioning of compressors; and
Assembly and fit-out of Galloway.
•
Pg 7/21 40864454v1