The Woodsmith Project - S73 Project Amendments : Planning Statement

Condition Number

Current Wording

Proposed Amendment

include details of maintenance to deal with any siltation of the attenuation storage basins and any resultant loss of capacity; g. A timetable for the implementation of the Surface Water Management Scheme, including during the construction phase. This is to include details regarding the phasing of the construction works demonstrating that the storage available during construction is maximised (i.e. that the period of time that only the minimum 1 in 20 standard of protection is kept to the shortest possible). Development shall thereafter proceed only in strict accordance with the approved Surface Water Management Scheme and the timetable included within it. Once implemented, the Surface Water Management Scheme shall be retained and maintained throughout the lifetime of the development such that it continues to function in the manner intended.

7.3 The inclusion of the above amendments to the approved conditions will ensure that the conditions applied to the approved scheme remain applicable but updated to reflect the revised proposals.

Section 106

7.4 There are two existing s106 agreements relevant in this regard; the first secured with North Yorkshire County Council and the second with the NYMNPA. Prior to the determination of the application, a draft S106 Supplementary Deed will be prepared and submitted to NYMNPA.

Pg 64