“Variation of Condition 5 of planning permission NYM/2014/0676/MEIA to allow minor material amendments relating to that part of the development at the Woodsmith Mine site (formerly known as Doves Nest Farm and Haxby Plantation), including; re-design of foreshafts and shaft construction methodology, changes to building layout and shaft access arrangements, revisions to construction and operational shaft platform levels, revisions to location and layout of surface water attenuation ponds, revisions to groundwater management arrangements and amendments to internal access arrangements” (Ref. NYM/2017/0505/MEIA). The amended scheme was approved subject to 98 planning conditions and a deed of variation to the originally approved Section 106 Agreement. It is this planning permission which has since been implemented at the minehead.
Non-Material Amendments
Since the above planning permissions were granted, eleven non-material amendments have been approved by the NYMNPA and RCBC (under Section 96A of the Town and Country Planning Act 1990):
NMA Ref. Number
Location
Description
Approval Date
NYM/2016/0845/NM Woodsmith Mine NYM/2017/0255/NM Woodsmith Mine NYM/2017/0399/NM Woodsmith Mine
Realignment of internal access road and alterations to drill pad datum level
21/12/16
New temporary access track
03/05/17
Replacement sub-surface grouting and cast concrete wall design with diaphragm walls to a depth of 60 metres to provide protection from groundwater ingress
25/08/17
NYM/2018/0181/NM Woodsmith Mine
Installation of Northern Power Grid substation
29/05/2018
R/2018/0268/NM
Lockwood Beck
Installation of a Northern Power Grid substation
01/06/2018
NYM/2018/0470/NM Woodsmith Mine NYM/2018/0589/NM Woodsmith Mine
Reintroduction of ventilation shaft
07/09/2018
Installation of telecommunications mast (approx. 15m) to be operated by Northern Power Grid
26/10/2018
NB. Approved but not implemented
NYM/2018/0662/NM Woodsmith Mine NYM/2019/0129/NM Woodsmith Mine
Installation and operation of LNG plant
23/01/2019
Design amendments to service shaft and production shaft buildings
05/04/2019